The traditional way to renovate is to hire a designer, have them draw your project, then take those drawings out to builders for pricing. It sounds sensible. It is also where a great many renovations come apart.
The gap nobody owns
The designer does not price construction. The builder did not shape the design. So the drawings arrive, the bids come back well above what you had in mind, and the redesign begins. Weeks pass. Selections get downgraded. The schedule moves.
Worse, when something on site does not line up, you become the person relaying messages between two firms who each believe the other is at fault.
What design-build changes
In a design-build firm the designers and the construction team work for the same company and talk to each other before anything is finalised. Pricing is developed alongside the drawings, not after them, with trade partners weighing in during the design phase.
You leave design with detailed drawings, real selections and an itemised fixed-price budget, instead of a rendering and a question mark. When a question comes up mid-build, it is answered internally.
What to ask
If you are comparing firms, ask who employs the designer, when pricing is developed, and who your single point of contact is once construction starts. The answers tell you most of what you need to know.